Blyth

operating
SA 2024
Total Capacity 200MW
Storage 400MWh
13 Nov, 11:02 am — 16 Nov, 11:02 am AEST
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data

About

Blyth Battery is Neoen’s second storage project in South Australia, its first was the famous Hornsdale Power Reserve.

Sized at 238.5 MW / 477 MWh, Blyth Battery has the largest energy storage capacity in the state.

The battery can store energy for 2 hours (at full capacity) during peak times, helping reduce pressure on the electricity grid and increasing the supply of renewable energy.

It is also contracted under a unique baseload agreement to help BHP power its mining operations at Olympic Dam using energy 24/7 from the Goyder South Stage 1 wind farm located nearby.