Bremer Bay
operating WA Western Australia 2004
Total Capacity 0.6MW
13 Nov, 8:52 am — 16 Nov, 8:52 am AWST
Total Energy --
Capacity Factor --
Avg Price Received --
Revenue --
Peak Output --
Generation
30 minMarket
About
This installation, opened in 2004, generates around 40% of Bremer Bay's annual electricity, which reduces the diesel consumption required by around 40,000 litres. Situated at Bremer Bay, around 400km south-east of Perth, the 600kw turbine sits at 46 metres high, featuring three 22-metre-long blades. An identical wind turbine was installed at Hopetoun Wind Farm, about 175km west of Esperance.
Owner
Units
1
unit