Bungama

operating
SA 2025
Total Capacity 150MW
Storage 300MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data

Generation

30 min
Power
MW

Market

About

The Bungama BESS is designed to integrate into the National Electricity Market through a 275 kV connection to ElectraNet’s Bungama Substation. Through grid connection, the Project will contribute to a more reliable and stable network for South Australia, by storing excess energy until it is needed. The project is being designed for an operational life of up to 25 years.

Units

1 unit