The Lincoln Gap Wind Farm complex near Port Augusta will ultimately consist of 468 MW of wind turbines.

Lincoln Gap Wind Farms 1 & 2 currently comprise a total of 212 MW of fully operational wind turbines. Stage 1 (126 MW) was completed in May 2021, and Stage 2 (86 MW) was completed in March 2022. The project also includes a 10 MW grid-scale battery storage system.