New England 1
operating NSW New South Wales 2026
Total Capacity 100MW
Storage 200MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data
Generation
30 minPower
MWMarket
About
New England Solar is a solar and battery project currently being built in stages near Uralla in the New South Wales (NSW) New England region.
The project sits across a 2,000-hectare site of mostly cleared grazing land, traversed by an existing 330kV power line owned and operated by TransGrid. The 521 MWdc (400 MWac) first stage started generating clean, renewable electricity into NSW and Queensland in 2023. The second stage 416 MWdc (320 MWac) is now in the pipeline while the 200 MW/2 hour battery storage is now underway. The New England BESS is being built through the support of the NSW Government’s Emerging Energy Program.